Documentation/Evaluate
Evaluate · v0.0.1

Enterprise evaluation plan

A bounded technical evaluation that produces evidence for platform, security, operations and release stakeholders.

AudienceTechnical sponsors · platform owners · securityReading time15 minutesCommands in contextNo terminal requiredReviewed sourcefcc5871 · 30 July 2026
RC

Exact release scope. This page documents the reviewed v0.0.1 source at fcc5871. Check release status before enabling a gated capability.

Define measurable outcomes

Use environment-specific baselines instead of general feature impressions.

OutcomeBaseline questionEvaluation evidence
Manual steps removedHow many privileged handoffs and commands are required today?Approved plan versus current runbook
Time to diagnoseHow long does an operator need to reconstruct a failure?Run, code, step, log, artifact and correlation availability
Retry safetyCan the team distinguish replay from duplicate intent?Idempotency and classified retry test
Upgrade decision timeCan compatibility and rollback posture be reviewed before change?Preflight, matrix, backup and acceptance evidence
Evidence coverageCan every critical decision and outcome be demonstrated?Actor, plan, events, artifacts, checksums and audit

Recommended four-stage scope

  1. 01

    Control-plane baseline

    Install, secure, observe, back up, restore and verify one non-production profile.

  2. 02

    Disposable lifecycle

    Validate one provider and create, inspect, scale, upgrade, replace and delete one disposable cluster.

  3. 03

    Cluster services

    Install one built-in add-on, prove semantic health, registry posture and approved dashboard access.

  4. 04

    Evidence and failure

    Run Sonobuoy, inject a controlled failure/restart, recover cleanup and complete customer-zero acceptance.

Entry and exit criteria

  • Named technical sponsor, platform owner, security reviewer and restore owner
  • Disposable provider project/account and test DNS/registry boundary
  • Written success thresholds and stop conditions
  • No production credentials or workloads in the first lifecycle exercise
  • Final decision records accepted gaps, required fixes and the exact release identity

Evaluation deliverables

DeliverableOwnerMinimum content
Architecture decisionPlatformTopology, trust, dependencies, profile and boundaries
Security assessmentSecurityIdentity, secrets, network, supply chain, audit and residual risk
Operations acceptanceOperationsInstall, monitoring, backup, restore, incident and support handoff
Lifecycle evidence packPlatform / QACreate, scale, upgrade, replace, add-on, validation and cleanup
Release decisionChange authorityExact commit/version, gates, exceptions, approvals and rollback